Graphical dispatch board for service planning in Dynamics 365 BC

Posted by Ute Gillet on Sep 27, 2021 11:40:58 AM

Dysel, a Microsoft Dynamics 365 Business Central ISV with headquarters in the Netherlands, is specialized in helping equipment management organizations by optimizing their business processes and providing them with top-quality software solutions. They develop, implement, and support the industry-specific ERP solution DYSEL, based on Microsoft Dynamics 365 Business Central.

Read in this blog post how the company enhanced their Graphical Dispatch Board (GBD) with advanced visual capabilities by using the Visual Scheduling Add-in Developer Toolbox (VSADT).

Read More

Visual service dispatcher for asset management in Dynamics 365 BC

Posted by Ute Gillet on Sep 20, 2021 11:27:15 AM

With its outstanding enterprise asset management (EAM) software, the Danish ISV Dynaway focuses on companies with high-value assets. The Scheduling Board add-on provides comprehensive dispatch information in one view, manual allocation of work orders as well as a direct connection to Microsoft Dynamics 365 Business Central.

Read in this blog post how the company developed a powerful dispatch board for maintenance work orders for high-value assets with the Visual Scheduling Add-in Developer Toolbox (VSADT).

Read More

How PrintVis built a production planning board for the print industry

Posted by Ute Gillet on Sep 15, 2021 12:46:22 PM

PrintVis is the Microsoft-certified Print MIS, a software solution specifically developed for the print industry. The solution is built directly on Microsoft Dynamics 365 Business Central. It meets both the most basic and advanced needs of any type or size of print or graphical arts company, from quote to invoice, including full production management and a complete financial package with robust business intelligence from Microsoft.

Read in this blog post how the Danish company used the Visual Scheduling Add-in Developer Toolbox (VSADT) to build their PrintVis Planning Board - a graphical interface for plotting and adjusting a print company’s production schedule.

Read More

Project and resource planning reference: Using capacities efficiently

Posted by Lawin Ileto on May 26, 2021 3:16:24 PM

Inarca SpA, a company based in Vigodarzere in Padua Italy, has been designing and developing connectors, terminals, connection technologies, and machines for electric connections (parts you find in washing machines, cars, etc.) since 1964. The company boasts 200+ patents and manufacture more than 7000 different products. Some of the products are used as components to some of the largest multinational companies in the world. 

The company found managing a high number of employees and a wide assortment of products as a big challenge. For them, it was very crucial to take into consideration different activities that could affect their resources, such as; capacity and scheduled machine maintenance. These activities are factors that determine the smooth and timely execution of their projects.

Read More

Visual production planning in NAV: Smoother processes and happy employees

Posted by Ute Gillet on May 6, 2021 7:13:59 PM

The German manufacturing company Winter + Freis replaced their "analog" production planning with an ERP system and realized that a graphical planning board was needed in addition to make their processes more transparent and thus provide more planning security for their employees.

Read in this blog post how the Visual Production Scheduler made this happen.

Read More

Customer story: Visual Production Scheduler solves planning conflicts and inconsistencies

Posted by Ute Gillet on Nov 5, 2019 1:19:07 PM

Kutterer Rus, a Russian manufacturer of components for aluminum and plastic tubes, as well as plastic packaging with in-mold labelling for the milk industry desperately needed to find a software that could keep pace with the company's steady growth.

Read in this blog post how they solved their problem with the help of the Visual Production Scheduler.

Read More

Customer story: Visual scheduling in NAV helps keeping delivery dates

Posted by Ute Gillet on Feb 20, 2019 10:51:59 AM

The Kenyan supplier of innovative solutions for water and energy systems, Davis and Shirtliff, desperately needed to improve their internal information exchange process to ensure keeping delivery dates as promised to their customers.

Read in this blog post how this worked out with the help of the Visual Production Scheduler.

Read More

Customer story: Improved machine utilization by visual scheduling in NAV

Posted by Ute Gillet on Jan 28, 2019 2:34:44 PM

The Swiss food supplements manufacturer, Nahrin AG, wanted to reduce the intermediate cleaning of the machines to a minimum. At the same time they need to react flexible to new orders and short delivery dates.

Read in this blog post how this worked out with the help of an individual extension of the Visual Production Scheduler.

Read More