Bottlenecks are common occurrences that happen in any industry that work with limited capacity. In general, the existence of bottlenecks could lead to stalls in production, supply overstock, issues with customers and issues with employees. This blog post shows how visual scheduling can help you identify bottlenecks in production when you work with Microsoft Dynamics 365 Business Central.
Here’s a simple example of an everyday bottleneck. It is an image of a typical traffic jam from my hometown in Manila, Philippines (this is one thing that I do not miss from back home 😊).
You can clearly see the bottleneck on the bus lane and the adjacent lane, which is not present on the other lanes. The bottleneck caused a traffic jam or a stall in movement from the cars on that lane. We know there are a lot of things wrong with this picture, but simply put, some problems we could identify are the following:
Now let’s shift our focus to manufacturing, where the term bottleneck is widely used.
It usually describes a point of congestion in a production system and somewhat highlights an inefficiency in the system. Effectively dealing with bottlenecks is vital for every organization as it helps them achieve efficiency, increase the throughput and, in the end, a better bottom-line.
The most obvious way to deal with bottlenecks is to identify them. And the best way to do that, would be to visualize them. Visualizing the bottlenecks makes it easier to see wait times, backlogged work and the resource causing the bottleneck. Once this information is available, it would be easier to shift work around by reschedule them or reassigning them to different resources.
Working with bottlenecks in Microsoft Dynamics 365 Business Central this is not easy. If you work with standard BC, then you already know that this is quite complicated. Since you do not have any visualization, as you only have tables, it is quite hard to draw conclusions by the data on the tables. You would need to really read between the lines, and in order to do that, you would need to know the following:
In the released production order table from the manufacturing module, I can see my released production orders, but not my other production orders with different statuses. It also does not give me a detailed visual of the different production order routing lines that make up my production orders. Therefore, it does not give me the whole picture of a schedule.
Here is what the resource card looks like on the job module. This is an example of one employee’s availability – Mark Hanson. Working with tables gives you a lot of detail for a certain resource or order, but it does not help you understand the big picture as I cannot compare what Mark is doing to what his colleagues from the same department are doing.
In terms of visualizing the data required, nothing gets the job done better than a Gantt chart, ideally complemented by a histogram (capacity load chart). With several different views it is possible to visualize all the data you need and stay on top of your orders and resources.
The VPS does not only give you a better overview, but you are also able to make drag and drop changes to the data on the Gantt chart.
We have gone even a step further in our new product, the Visual Advanced Production Scheduler (VAPS). We have the functionality to view wait times, which let’s you even have a better understanding of your bottlenecks. With wait times we refer to the time that a successor has to wait on a certain machine after the finish of its predecessor because the machine is scheduled to work on other operations first.
By using different colors, we help customers visualize whether their operations can start right after their previous operation or if they would need to wait. We also make it easy to see whether or not because of waiting, the production order misses its due date.
Using the wait time view I can easily see the operations that do not start right after their preceding operation ends. This is shown in a yellow color. You can see clearly that my operation 30 does not start right after my operation 20, because the machine center is busy with another operation. The same happens to operation 40. Operation 20 starts right after my operation 10, thus its color is different (grey).
Here I see how my wait time on my bottleneck actually leads to a missed due date. I see that my operation 40 and 50 do not finish before the due date, thus my whole production order will be delayed. The wait time view shows that the cause of the delay are actually my operations 10 and 20, and you that they are in color red here.
Bottlenecks are something that our visual scheduling extensions were made to solve.
We help identify and visualize bottlenecks and give you several tools to help you deal with them. We have products for both the manufacturing and job modules of Business Central.